HZS180 Concrete Batching Plant
Measurement(m) :53*25*21
Total Power(KW) :275
Mixer Model :JS3000 Concrete Mixer
Theory Productivity(m3/h) :180
OVERVIEW
Introduction:
YCZG HZS180 concrete batching plant is equipped with imported SICOMA concrete mixer, PLD4800 batching machine, conveying system and weighting system,etc. Air dynamic division weighing in batcher improves aggregates weighing efficiency. Stable pneumatic system electrical sensor & aluminum alloy butterfly valve ensure weighing system work accurately. Monitor is optional to install in SCHNEIDER & SIMENS components in PLC+PC control system.Advantage:
1、Imported SICOMA concrete mixer; 2、Easy-operation with SCHNEIDER and SIEMENS components in PLC+PC model; 3、Planetary reducer; 4、Stable pneumatic system; 5、Well-designed electrical system; 6、Feeding method: belt feeder; 7、Specialized additive mixer tank; 8、Electrical mixer dust-proof device.PARAMETERS
| HZS180 | ||
| Theory Productivity(m³/h) | 180 | |
| Standard Discharging Height(m) | 4.2 | |
| Mix Cycle Time(s) | 60 | |
| Measurement(m) | 53*25*21 | |
| Total Power(KW) | 275 | |
| Mixer Model | JS3000 | |
| Batching Machine Model | PLD4800 Pneumatic Independent Weighing | |
| Belt Width mm | 1000 | |
| Belt Machine Power kW | 45 | |
| Feeding Method | Belt | |
| Weighing Accuracy | Aggregate | ≤2 |
| Cement and Ash Coal | ≤1 | |
| Water | ≤1 | |
| Additive*2 | ≤1 | |
| Screw Conveyor Model | LSY325 Italy Technology | |
| Silo | 4×200t Detachable Silo | |
| Control System | Centralized Control | |
| MOQ | 1 set | |
| Delivery Time | 20days | |
| Delivery Port | Qingdao or Tianjin | |
LAYOUT
Diagrammatic Sketch
1、Cement bin 2、Screw conveyor 3、Weighing System 4、Control room 5、Concrete Mixer 6、Bottom pillar 7、Thong 8、Batching plant
*The picture just can be referenced. If you need more details about YCZG products, please contact: E-mail: info@yczggroup.com
Technical Specifications
1. This drawing is only for installing HZS120 concrete batching plant: specifications are just dimensions of different foundations and relationships among them, actual construction process should be guided by professional civil engineers;
2. Pour C30 concrete after laying a solid foundation, put steel mesh. Please reinforce foundation according to local soil texture;
3. Base plates’ dimension under support legs of main station: 20×800×800; weld four Ф30×1300 anchor bolts under each base plate; length of hook head: 100, four pieces in total;
4. Base plates’ dimension of support legs of inclined belt conveyor: 12×500×500; weld four Ф16×700 anchor bolts under each base plate, length of hook head: 100, ten pieces in total;
5. Ten base plates’ dimension under support legs of batcher: 16×350×700, weld four Ф16×700 anchor bolts under each base plate, length of hook head: 100; Two base plates’ dimension are 16×350×900, weld four Ф25×1300 anchor bolts under each base plate, length of hook head: 100;
6. Match two Ф273 and two Ф325 screw conveyors all at an angle of 30°, length: 9000;
7. Deploy four cement silos with each capacity in 200T, their discharging height : 7350;
8. Engineering drawings of installing cement silos is in one attached drawing ;
9. Considering the height of the plant, suggest users to set lightning protection facilities on main station and cement silos.
10. Considering installed form of HZS120, suggest users to adopt drainage equipment;
11. Actual foundation construction should be guided by professional civil engineers. Keep the construction site clean after working;
12. To make sure the project finished on time and save costs, please contact with YCZG technicians if you found wrong figures or couldn’t understand the drawing totally before operating the machines. (length unit: mm)
*The picture just can be referenced. If you need more details about YCZG products, please contact: E-mail: info@yczggroup.com

Comments
Post a Comment